Stage one, the survey
We Measure the Garden Before We Have an Opinion About It.
Every design starts with a measured survey, not a mood board. Levels are taken off one fixed datum, so the whole garden is described against a single point. That is the only way a terrace, a flight of steps and a lawn can be made to agree with each other on paper.
We dig soil pits rather than guess. Around Camberley the ground is often free draining Bagshot sand over gravel. Elsewhere across our patch the subsoil is heavy clay that holds water all winter. The same drawing cannot serve both, and a planting plan certainly cannot.
We also record the dull things that wreck a layout later: the damp proof course, the manhole covers, the water and electricity runs, the root protection area of a tree you want to keep. All of it is far easier to see now than after the paving is down.
- Levels taken off one fixed datum
- Soil pits dug so we see the subsoil rather than assume it
- Damp proof course recorded before any terrace height is set
- Manholes and service runs plotted while they are still visible
- Root protection areas marked for every tree that stays