First fix
The Pipe Goes in Before the Paving Does.
Mains feed, manifold position, duct runs under hard surfaces and the route back to the controller are all set out at groundworks stage, in the same week as the drainage. Anything that has to cross a terrace, a path or a drive crosses it inside a duct, so a head can be moved or a valve replaced in ten years without lifting a slab.
We take the supply from a point we have tested, not from the nearest outside tap. The irrigation main is sized to the flow we measured and laid deeper than a border will ever be dug, with a double check valve where it leaves the house supply and an isolator you can actually get to.
Valve boxes go in flush, bedded in gravel, at the edge of a bed rather than out in the middle of the lawn. It sounds like a small thing. It is the difference between a ten minute repair and an afternoon of digging.
- Supply tested for flow and pressure before anything is specified
- Ducts under every terrace, path and drive crossing
- Valve boxes set flush at bed edges, never mid lawn
- Every run photographed before backfill so it can be found again