Groundworks and drainage
Where the Water Goes Is Settled Before Anything Is Built.
Most of the gardens we are called into have a water problem, and it is usually a made one. Builders rubble under a thin skin of topsoil, a clay pan smeared flat by a tracked machine, a lawn sitting lower than the beds around it. Pave over that and the paving will tell you about it within two winters.
So we dig trial holes and look at what is actually there before the specification is fixed. Where the subsoil is heavy we cut land drains into clean gravel, wrap them in geotextile and run them to a soakaway or an existing surface water route. Falls are set so water always leaves a hard surface away from the house, and thresholds get a channel drain rather than a hopeful gap.
Where ground is compacted rather than genuinely wet, we would rather open it than bury it. Deep soil aeration decompacts to around a metre with compressed air and holds the fissures open with enriched biochar, which beats another load of hardcore and does not cost you the lawn.
- Trial holes dug before the specification is fixed
- Land drains in clean gravel, wrapped in geotextile
- Falls set away from the house and away from doors
- Channel drains at thresholds and at the foot of steps
- Permeable build ups where run off has nowhere to go