A CJ Landscapes guide · Planning and consents
What Needs Permission, and What Usually Does Not.
Most garden work in England is already allowed without an application. This is a plain guide to the parts that are not, written from the questions clients actually ask us before a garden is drawn, and your council is always the one who decides.
One of the first questions on any new garden is whether a terrace, a deck, a wall or a garden room needs planning permission. The honest answer is that most garden work does not, and the jobs that do are usually predictable once you know what the rules are actually looking at.
This page sets out the questions worth asking before anything is drawn or ordered. It is guidance, not law, and it is written for private gardens in Surrey and the towns around it, from Camberley and Sunningdale to Cobham and Richmond.
One thing to be clear about from the start. Your local planning authority decides what needs consent on your plot, and nobody else can decide it for them. We are landscape designers and contractors. We will tell you when something looks like a planning question, and then we will point you at the people whose answer counts.
In short
- Paving at ground level
- Usually allowed without an application, though drainage and the front garden need thought.
- Raised decking
- Height above the ground is what matters, not area. Treat any raised platform as a question to ask.
- Garden rooms
- Often allowed if the use stays incidental to the house and nobody lives or sleeps in it.
- Walls and fences
- Usually allowed up to a modest height, and lower where a boundary meets a road or footpath.
- Trees
- A preservation order or a conservation area generally means telling the council before any work.
- Who decides
- Your council, every time. We build to consent. We do not grant it, and this page is not a decision.
The Question Almost Every Garden Project Turns On
Most work in a private garden sits inside what is called permitted development. That generally means an application is not needed, though your council is the one to confirm it. The jobs that fall outside it are usually the ones that change the shape of the plot rather than its surface: height, level, enclosure, and anything that lets one garden see into another.
So the first question on a new garden is not really whether it needs permission. It is what you are changing. A terrace laid on the existing ground, a border dug and planted, a path, a new lawn, an irrigation zone or a lighting circuit almost never raises a planning question. A deck you step up onto, a wall holding back a new level, a studio at the end of the garden or a mature tree coming out can all raise one.
Two things sit over the whole of it. Where the house is matters, because a conservation area, an Article 4 direction, a listed building or Green Belt land each narrow what is allowed. And the authority is your council, not your contractor and not your designer. We build to consent. We do not grant it.
- Rarely a planning question: paving at existing ground level, paths, steps within the ground, lawns, borders and planting, irrigation, garden lighting, soil work.
- Often a planning question: raised decking and platforms, tall walls and fences, retaining structures, outbuildings, work to protected trees, anything close to a listed building.
- Always worth checking first: conservation areas, Article 4 areas, listed buildings and their curtilage, Green Belt plots and flood risk areas.
Terraces, Paving and Paths at Ground Level.
Hard landscaping laid at or close to existing ground level is usually permitted development. For most gardens that means a new terrace, a path and a set of steps can be designed and built without an application, and the material, the size and the layout are yours to choose. Porcelain, sandstone, granite setts, gravel or brick makes no difference to the planning question.
Two things still deserve thought. The first is where the water goes. A large area of sealed paving has to drain somewhere, and the right answer is almost always inside your own garden, into a border, a soakaway or permeable joints, rather than towards the road or over a boundary. Councils take surface water seriously, and so do neighbours downhill of you.
The second is the front of the house, where the starting point is tighter than at the back and a sealed surface draining onto the highway is the usual trigger for an application. Close to the house there is a practical issue as well as a planning one: paving built up against an old solid wall can bridge the damp course, so levels and drainage are set to fall away from the building.
Conservation areas and listed buildings change this picture, particularly within sight of the street or against the house itself. There is a section on both further down.

Raised Decking and Anything You Step Up Onto.
The moment a surface stops sitting on the ground and becomes a platform you step up onto, planning takes an interest. Raised decking, a seating platform built out from a slope, a terrace over a garage or a sun deck on legs are all judged by how far they stand above the existing ground, not by how large they are.
The height at which paving becomes a raised platform is lower than most owners expect, and it is exactly the sort of figure people quote at each other from memory and get wrong. Rather than work to a number you have read somewhere, treat any raised structure as a question for your council's planning team before timber is ordered. They will tell you how they read it on your plot, which is the only reading that matters.
Overlooking is the other half of the question. A platform that lifts you level with a neighbour's windows, or lets you look over a boundary you could not see over before, is the most common reason a garden scheme attracts an objection. There is usually a design answer. Set the platform back from the boundary, step it down into two levels, cut into the slope instead of building out from it, or screen it with pleached hornbeam rather than a taller fence.
Build regulations run alongside planning here. A platform with a drop off the edge needs a balustrade that is fit for the job, and a deck carrying people and furniture needs a frame sized for the load. We would rather redraw a terrace at sketch stage than have you defend one that was never going to work.
- Height above existing ground is the measure, so a deck on a slope can be low at one end and a platform at the other.
- Check before ordering, not after building. A raised deck taken down again means paying twice for the frame, the boards and the labour.
- Cutting into a slope usually reads better and asks less of the planning system than building out from it.
Walls, Fences and the Boundary
A wall or fence on a boundary is usually allowed up to a modest height without an application, and the allowance is generally lower where the boundary meets a road, a footpath or a shared drive. Anything taller than that normally needs permission, and in a conservation area or next to a listed building the starting point can be stricter again. Your council's planning team is the one to confirm the heights that apply to your boundary, and it is worth asking before anything is ordered.
A retaining wall is a different animal. Holding back a change in level is structural work, and the questions are not only about planning: whether the wall is designed for the load behind it, how the ground behind it drains, and where that water ends up. We build retaining structures to an engineer's design where the height or the ground conditions call for it, in blockwork, reinforced concrete, oak sleepers, stone or gabion, always with drainage behind them.
Then there is ownership, which is a deeds question and not a planning one. Before anybody touches a boundary it is worth knowing whose it is, because replacing a neighbour's wall without asking starts a conversation you do not want. Excavating close to a neighbour's wall, garage or house can also bring the Party Wall etc. Act into play, which generally means serving written notice before work starts. That is far easier handled at drawing stage than with a digger already on site.
Garden Rooms, Studios and Other Outbuildings.
A garden room, a store or a studio is often permitted development, and the conditions that carry it are about use, scale and position rather than looks. The usual tests are whether the building stays incidental to the enjoyment of the house, whether it is single storey, how tall it is, how close it sits to a boundary, how much of the garden it covers, and whether any part of it comes forward of the front of the house.
The use test catches more people than the height test. A room with a shower, a kitchen and a bed, lived in independently or let out, is generally treated as a different proposition from a studio, a gym or a garden office, and it is the use rather than the drawing that a council looks at. If anyone is going to sleep in it, ask the council first.
In a conservation area, under an Article 4 direction or within the curtilage of a listed building, outbuildings are treated more tightly, and particularly so at the side of a house where they are visible from the street.
We do not supply garden buildings, so the consent is not ours to chase. What we do is the ground around it: a level base laid on a compacted sub base, drainage taken away from the building, the terrace it opens onto, and ducting for power and water laid while the ground is still open rather than chased in through finished paving. Your electrician makes the connections, and the electrical work is covered by building regulations in its own right.

Trees, Hedges and the Wildlife in Them.
A tree is the one thing in a garden that can be protected in its own right. A tree preservation order can cover a named tree, group or woodland whatever its size, and in a conservation area trees of any reasonable size are generally protected as well. In both cases work usually means giving your council written notice first and waiting out a notice period, and they will tell you how long that runs. Felling or cutting back a protected tree without that is a serious matter, so checking is the only sensible first move.
Checking is quick. Your council's tree team will tell you whether a tree is covered, and many publish a map you can search by address. Do that before anyone quotes for work on the tree, and use a qualified arboriculturist for the work itself.
A tree that is staying still shapes the build. Roots spread much further than the canopy suggests, and a trench for a wall footing or a dug out terrace inside the root zone can kill a mature tree several years later, long after anyone connects the two. Where we are working under a canopy we build off the ground rather than into it, on a no dig cellular base, or we move the structure. Where the ground around a tree is already compacted, deep soil aeration opens the soil back up without a trench anywhere near the roots.
Wildlife law sits alongside planning and does not wait for an application. Nesting birds are generally protected while they are nesting, which is why hedge work is planned around the season rather than straight through it. Bats using a roof or an outbuilding, and newts in or near a pond, are generally protected too, and where there is any real chance of them the right order is an ecologist before machinery. Separately, if a neighbour's evergreen hedge has become a genuine problem, many councils run a high hedges complaint process, which is not a planning application at all.
Conservation Areas, Article 4 and Listed Buildings.
In a conservation area permitted development is narrower, and the garden is part of what is being conserved. Changes to a front boundary, outbuildings at the side of the house, hard surfaces visible from the street and the removal of old walls, railings or gates all come under more scrutiny. Materials matter more here than anywhere else, because the council is usually looking for the wall and the surface to read as part of the street rather than against it.
An Article 4 direction goes further and removes specific permitted development rights across a named area, which is why two houses a street apart can have genuinely different starting points. It is not something you can work out by looking at the houses. It is published, and the council will tell you.
A listed building is the strictest case, and the point most owners miss is that the listing is not only the house. Structures within the curtilage can be covered too: garden walls, steps, railings, gates, outbuildings and sometimes historic paving. Listed building consent is a separate consent from planning permission, so a scheme can need one, the other or both, and work that affects the character of a listed building without consent is treated far more seriously than a paperwork slip, so the conservation officer is worth a call first.
Older houses also behave differently at ground level. Solid walls with no damp course rely on the ground staying below the internal floor and draining away from the wall, which is why a new terrace against a period house is detailed with levels, a drainage channel and a gap rather than simply butted up to the brickwork. Where a house is listed or in a conservation area we expect a designer or planning consultant who knows heritage work to be in the conversation from the first sketch, and we build to the drawings and conditions they secure.
Planning Permission Is Not the Only Permission.
Several other approvals sit near a garden project, and the planning answer tells you nothing about them. Building regulations cover structure and safety rather than appearance, and they can apply to retaining walls, raised terraces and the balustrade around a drop, structural decking, anything built against the house, and the electrical work behind garden lighting and an irrigation controller.
Drainage is the one that catches people out on site. Building over or close to a public sewer usually needs an agreement with the water company before work starts, and a manhole cover sitting in the middle of a lawn is the clue that there is a plan worth looking at. In a flood risk area, or on a scheme that adds a lot of hard surface, a council will generally want to see where surface water goes, designed in rather than added afterwards.
Private covenants are the quietest problem of all. A title deed can forbid something that planning would allow, such as a structure above a stated height, a building near a boundary, or any fence across the front of a house on an estate. A council does not check your deeds, and neither do we. Your solicitor's copy of the title is the place to look, and it is worth a glance before a design gets to the detail stage.
Finally there is access. Shared drives, rights of way across a plot and narrow side returns decide what machinery can reach the garden, which in turn decides how a wall or a terrace is built. None of that is planning, and all of it is better known early.
- Building regulations: retaining walls, raised platforms and balustrades, structural decks, work against the house, garden electrics.
- Water company: an agreement is usually needed to build over or close to a public sewer.
- Deeds and covenants: private restrictions that sit outside the planning answer, so they are worth checking with your solicitor.
- Wildlife law: protected species and nesting birds, whatever the planning position.

How to Find Out for Certain
There are three straightforward routes, and all of them are better than an opinion from a forum. Your council's planning pages set out what counts as permitted development for a house, and the national Planning Portal explains the same ground in plain terms with worked examples. Start there, because for most gardens that is where the answer already is.
If the answer is not obvious, many councils offer a pre application service. A planning officer looks at a sketch and a few photographs and tells you what they think, usually for a fee and usually in writing. For a scheme with a raised terrace, a tall retaining wall or a building in a conservation area, that fee is the cheapest part of the project.
If you want certainty about something you believe is already allowed, a certificate of lawful development is an application that asks the council to confirm it formally. It is worth having when you expect to sell, because a buyer's solicitor will ask about the deck and the studio even if nobody else ever did.
Where a full application is needed it is usually a householder application: drawings, a site plan, a fee and a decision in the council's own time. A designer or planning consultant prepares and runs it. We are not planning consultants and we will not pretend otherwise, so what we do is flag the question at survey stage, design around it where there is a design answer, work to whatever is approved, and hold off starting anything that needs consent until it has been granted. If a scheme needs an application, the cheapest time to find out is while it is still a line on a drawing.
Good to know
Questions We Are Asked Most
Do I Need Planning Permission for a New Patio or Terrace?
Usually not, if it is laid at or close to existing ground level. Paving, paths and steps within the ground are generally permitted development. The exceptions worth checking are a sealed surface at the front of the house draining onto the road, work close to a listed building, and gardens in conservation areas. Your council is the one to confirm it for your address.
Does Raised Decking Need Planning Permission?
It depends on how far above the existing ground it sits, and the height that counts is lower than most people expect. Anything you step up onto is treated differently from paving on the ground, and overlooking a neighbour is the usual sticking point. Ask your council before timber is ordered, because a raised deck taken down again is expensive.
Can I Build a Garden Room or Studio Without Permission?
Often yes. The usual conditions are that the use stays incidental to the house, the building is single storey, it is within a certain height, it does not cover too much of the garden and it does not come forward of the front of the house. A room anyone sleeps in or lets out is generally a different question, and conservation areas and listed buildings are tighter.
How High Can a Garden Wall or Fence Be?
Boundary structures are usually allowed up to a modest height without an application, and lower where the boundary meets a road or footpath. Rather than work from a figure someone has quoted you, ask your council what applies to that boundary. A retaining wall raises structural and drainage questions on top of the planning one.
Can I Cut Down or Cut Back a Tree in My Own Garden?
Only once you know whether it is protected. A tree preservation order or a conservation area generally means giving your council written notice and waiting before any work happens, and doing it without that is a serious matter. Checking takes one call or a look at the council's tree map, and the work itself belongs with a qualified arboriculturist.
Will CJ Landscapes Sort the Planning Application for Me?
No, and we would rather say so plainly. We are landscape designers and contractors, not planning consultants. What we do is raise the question at survey stage, redesign around it where a design answer exists, work alongside your architect, designer or planning consultant, and build only what has been approved.
Related services
The Work Behind the Guide
- Landscape ConstructionTerraces, paths, levels, retaining walls and outdoor rooms, built in house from groundworks to the final joint.

- Garden DesignSurvey, concept and planting plan, drawn around how you actually want to use the garden and what the ground will support.

- BiodiversityGardens that support pollinators, soil health and local wildlife, designed to develop with nature rather than against it.

Start your garden
Tell Us the Garden, and We Will Tell You the Questions.
If you are weighing up a terrace, a change of level or a garden you want designed from first sketch to final plant in Camberley, Ascot, Cobham or anywhere across Surrey, talk to us before the drawings are finished. We will tell you where consent is likely to come into it, and who needs to answer that, before anyone draws a line.
- 01We Call You BackWithin one working day, to talk the garden through.
- 02The First VisitA walk round the garden to take in the levels, the access and where the water sits.
- 03A Written ScopeA specification and a programme, with samples to see in your own light.